GALVANIZED SLOT DRAIN CLEAN OUT SYSTEM


Slot drain clean out system is designed to provide you with possibility to clean your slot drain system from debris and avoid clogging. It consists of two parts, plastic base (installed underground) and slot system itself. Slot can be filled with the same aggregate filler that is used for the project (concrete, gravel, different type of paving, such as asphalt or stone). Since insert and base are separate parts, the insert can be easily taken out of the base and provide access for removing debris and cleaning. The system works with any basic channel's depths.
PARAMETERS
Article ................................ 4COUTGG
Material ............................. PPE Plastic / Galvanized Steel
Dimensions ....................... 19.4"L x 6"W
Depth ................................. 16" or 24" (up to your choice)
Load Class ....................... D Class - 88,000 LBS
INCLUDED IN PACKAGE
1 - Plastic Sand Trap
1 - Galvanized Steel Slot Drain Trap Base and Cap
1 - Debris Basket
Our catch basin and sand trap installations are very similar to trench drain installation, however there are a couple of steps to make sure its ran smoothly. So, lets go step by step.
1. Make sure you know where your outlet height and location is going to be. Something that we need to make sure of is that the distance between the basin outlet and where the piping is, is level. This is by trial and error as stated in step 3.
2. Dig your basin hole 2-3 inches wider than the basin, and 3-4 inches deeper. This allows for your "filler" to get poured after placement. By filler we mean concrete, sand, clay, or any material that you are using.
3. Place your 2-3 inches of your filler at the bottom of your catch basin hole. Then at this point is where you will make sure that your pipe connection is level. Once you have the desired height on the surface, and your outlet is lined up, then you connect your outlet piping immediately.
4. Fill around your basin with cement , concrete, or whichever filler you desire. make sure its in all crevices and no air is in. This makes for a long lasting basin. If concrete, please allow to settle for 48 hours before driving over.
And that's all. If you have any questions, please feel free to contact us at anytime. Thank you for choosing Standartpark!

Customer Reviews
Slot drain clean out system is designed to provide you with possibility to clean your slot drain system from debris and avoid clogging. It consists of two parts, plastic base (installed underground) and slot system itself. Slot can be filled with the same aggregate filler that is used for the project (concrete, gravel, different type of paving, such as asphalt or stone). Since insert and base are separate parts, the insert can be easily taken out of the base and provide access for removing debris and cleaning. The system works with any basic channel's depths.
PARAMETERS
Article ................................ 4COUTGG
Material ............................. PPE Plastic / Galvanized Steel
Dimensions ....................... 19.4"L x 6"W
Depth ................................. 16" or 24" (up to your choice)
Load Class ....................... D Class - 88,000 LBS
INCLUDED IN PACKAGE
1 - Plastic Sand Trap
1 - Galvanized Steel Slot Drain Trap Base and Cap
1 - Debris Basket
Our catch basin and sand trap installations are very similar to trench drain installation, however there are a couple of steps to make sure its ran smoothly. So, lets go step by step.
1. Make sure you know where your outlet height and location is going to be. Something that we need to make sure of is that the distance between the basin outlet and where the piping is, is level. This is by trial and error as stated in step 3.
2. Dig your basin hole 2-3 inches wider than the basin, and 3-4 inches deeper. This allows for your "filler" to get poured after placement. By filler we mean concrete, sand, clay, or any material that you are using.
3. Place your 2-3 inches of your filler at the bottom of your catch basin hole. Then at this point is where you will make sure that your pipe connection is level. Once you have the desired height on the surface, and your outlet is lined up, then you connect your outlet piping immediately.
4. Fill around your basin with cement , concrete, or whichever filler you desire. make sure its in all crevices and no air is in. This makes for a long lasting basin. If concrete, please allow to settle for 48 hours before driving over.
And that's all. If you have any questions, please feel free to contact us at anytime. Thank you for choosing Standartpark!
