4" Basic PolyMax® trench drain w/ cast iron grate, C class


PARAMETERS
Article ................ 4BCIG
Material ............. PPE Plastic / Ductile Cast Iron
Dimensions ....... 39.4"L x 5.8"W
Load Class ....... C Class - 55,000 LBS (Heavy Duty Load)
CHANNEL OUTLET OPTIONS
2" depth: 2" bottom outlet
3" depth: 4" bottom outlet
4" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
6" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
8" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
INCLUDED IN PACKAGE
1 - Channel
2 - Ductile Cast Iron
2 - Grating Fasteners
2 - End Caps Per Order
* extra end caps at checkout
- TRENCH DRAINS - INSTALLATION INSTRUCTIONS
- BASIC CHANNEL - ASPHALT INSTALLATION SCHEME
- BASIC CHANNEL - TILE COVER INSTALLATION SCHEME
This installation scheme is for the standard set in place install of linear trench drain systems. Below is an example of a 4" system being installed.
1. First cut your trench approx 2-3 wider than your entire system, or what will make you comfortable. This allows for easy concrete pour after setting your channel. Do not forget to cut and dig deep enough for your boot pour.
2. We recommend pouring a level or flat 2-4 inches of concrete as a "boot" to set the trench in. Let this boot cure over 48 hours before proceeding with trench drain placement.
3. Connect your trench drain pieces in the trench with tongue and groove snap connections. This is the most intricate part of the installation as the way you line this up will be the way it will set and stay.
4. Pour your concrete to fill in the sides. Standartparks systems, all of them, have in depth ribs that will allow for concrete to pass through UNDER the system to hold it in place. This is a patent design that no others have, which allows the trench drain and the concrete to become one in the same. Trust us, over time, you will notice the difference when your channels do NOT move.
5. If you wish to have a silicone barrier in-between the system and your concrete, do this after the concrete has hardened for 48 hours. We recommend a water proof silicone base. If you don't know what this is, think about the spongy material in-between sidewalks. This allows for "give and take" through weather changes over time with the concrete.
NOTICE - Concrete is just the recommended installation substance. and is not always needed. Judge your project right. Bricks, sand, clay, etc etc can be acceptable. But this decision is always yours. And as always... if you ever have any questions, you can ask us at anytime. Thank you again for choosing Standartpark.


PARAMETERS
Article ................ 4BCIG
Material ............. PPE Plastic / Ductile Cast Iron
Dimensions ....... 39.4"L x 5.8"W
Load Class ....... C Class - 55,000 LBS (Heavy Duty Load)
CHANNEL OUTLET OPTIONS
2" depth: 2" bottom outlet
3" depth: 4" bottom outlet
4" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
6" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
8" depth: 4" bottom outlet - 3" side outlet - 3" end cap outlet
INCLUDED IN PACKAGE
1 - Channel
2 - Ductile Cast Iron
2 - Grating Fasteners
2 - End Caps Per Order
* extra end caps at checkout
- TRENCH DRAINS - INSTALLATION INSTRUCTIONS
- BASIC CHANNEL - ASPHALT INSTALLATION SCHEME
- BASIC CHANNEL - TILE COVER INSTALLATION SCHEME
This installation scheme is for the standard set in place install of linear trench drain systems. Below is an example of a 4" system being installed.
1. First cut your trench approx 2-3 wider than your entire system, or what will make you comfortable. This allows for easy concrete pour after setting your channel. Do not forget to cut and dig deep enough for your boot pour.
2. We recommend pouring a level or flat 2-4 inches of concrete as a "boot" to set the trench in. Let this boot cure over 48 hours before proceeding with trench drain placement.
3. Connect your trench drain pieces in the trench with tongue and groove snap connections. This is the most intricate part of the installation as the way you line this up will be the way it will set and stay.
4. Pour your concrete to fill in the sides. Standartparks systems, all of them, have in depth ribs that will allow for concrete to pass through UNDER the system to hold it in place. This is a patent design that no others have, which allows the trench drain and the concrete to become one in the same. Trust us, over time, you will notice the difference when your channels do NOT move.
5. If you wish to have a silicone barrier in-between the system and your concrete, do this after the concrete has hardened for 48 hours. We recommend a water proof silicone base. If you don't know what this is, think about the spongy material in-between sidewalks. This allows for "give and take" through weather changes over time with the concrete.
NOTICE - Concrete is just the recommended installation substance. and is not always needed. Judge your project right. Bricks, sand, clay, etc etc can be acceptable. But this decision is always yours. And as always... if you ever have any questions, you can ask us at anytime. Thank you again for choosing Standartpark.



Standartpark Company
We have been in business for over 19 years, working hard within the European market, and setting standards which are now used world wide. We bring this hard work now to Canada. As one of the top leading manufacturers of surface drainage systems and solutions in the European market, we now open our project and customer division herein Canada. We are a proud company, who promotes higher standards for residential and industrial solutions and standby our products. We are happy to finally be here, and looking forward to the future.
«STANDARTPARK» TODAY:
- 19 years on the market
- 6 production plants
- More than 35 sales offices in different cities and countries
- International team of employees of more than 550 people
- Design bureau (development of new own products)
- Design service (design and calculation of engineering networks)
- More than 15 product lines, 10 under own trademarks
- The production of the company is certified according to the quality management standard ISO 9001 and the quality of the goods is confirmed by the Declaration of Performance.

Our Mission Statement
To change the efficiency of your homes, recreational areas,streets and cities - to preserve and protect the natural beauty which is found at your front door steps, to the very jobs you work at or build.
Water will always choose the shortest and easiest way out, but we will create these ways that are more efficient and satisfy you, our customer, while being a great and easy installation at the same time.
We strive to provide a safe neighborhood for people and water to coexist with each other - and to save our roadways from the destructive power of mother nature.
How we started?
Standartpark’s history dates back in 2000, when during our travels we were faced with a repeating issue - How to reach a solution that is better than others- How to effectively remove dirt, debris, and water without any future issues. We reject and remove the excuses about a system that won't work, a system that doesn’t solve your problem. We focus on the facts, and know that we at Standartpark can make a large difference to live in a clean and efficient environment.
Where can our products be used?
- Residential Buildings
- Warehouses, Sea Ports
- Airports
- Railway Stations
- Parking Lots
- Stadiums
- Swimming Pools
- Landscaping Architecture
- Roofs
- Gas Stations and Service Stations
- Car Washes
- Parks
How do we operate?
We design, manufacture and sell our own drainage solutions. We take out the middle man to make sure you have the best price and customer service possible. Something that, in our opinion, is running out of style. We conduct and host seminars, training sessions, and design solutions with
the top leaders of the building industry along with sellers of network sales nations wide. Our staff is highly trained to make complex calculations for your project. We use materials such as galvanized stamped steel, ductile cast iron, and PPE Plastic along with much more, depending on your installation and specifications. These materials can be used in any design solution, taking into account the aggressive nature of our environment, and allow us to solve these issues.
Standartpark is its own design office and effective management system. We are an acclimated and very reliable brand that is well known and trusted in Europe, and will be very soon in Canada. We have a keen eye in the internet market and customer market, we promote our products with pride and a smile. And are happy to finally serve you.
Thank you for choosing Standartpark.